Our Migration Process

A proven, zero-downtime approach to migrating from cloud to bare metal infrastructure

Typical 6-Month Timeline

1

Discovery

Infrastructure analysis and planning

Weeks 1-2
2

Planning

Detailed migration strategy development

Weeks 3-4
3

Infrastructure

Hardware setup and configuration

Weeks 5-10
4

Migration

Application and data migration

Weeks 11-18
5

Testing

Comprehensive validation and testing

Weeks 19-22

Cutover

Final migration and optimization

Weeks 23-24

Detailed Migration Phases

1

Phase 1: Discovery & Assessment

We begin by thoroughly understanding your current infrastructure, workloads, and business requirements.

Key Activities:

  • Infrastructure inventory and mapping
  • Performance baseline measurement
  • Cost analysis and optimization opportunities
  • Dependency mapping
  • Security and compliance review

Deliverables:

  • Current state architecture diagram
  • Performance benchmarks
  • Cost savings projection
  • Risk assessment
2

Phase 2: Migration Planning

Create a detailed roadmap for your migration with minimal risk and zero downtime.

Key Activities:

• Target architecture design
• Hardware specifications and sizing
• Migration sequence planning
• Rollback strategy development
• Team roles and responsibilities

Deliverables:

• Migration roadmap
• Hardware procurement list
• Project timeline
• Risk mitigation plan
3

Phase 3: Infrastructure Setup

Set up your infrastructure (owned, rented, or rent-to-own) in parallel with your existing cloud setup. Modern tools and automation make this process straightforward.

4

Phase 4: Application Migration

Systematically migrate applications and data with continuous validation. Architecture adjustments may be needed to optimize for non-cloud environments.

5

Phase 5: Testing & Validation

Comprehensive testing to ensure everything works perfectly before cutover.

Phase 6: Cutover & Optimization

Execute the final migration with careful monitoring and optimization. Brief downtime windows may be required for final cutover.

Zero-Downtime Migration Approach

Parallel Running

Both environments run simultaneously during migration, ensuring continuous service availability.

Incremental Migration

Move workloads gradually, validating each step before proceeding to the next.

Real-time Replication

Keep data synchronized between environments until final cutover.

Instant Rollback

Ability to revert to cloud infrastructure immediately if any issues arise.

Technology Considerations

Compute

  • • Bare metal servers vs VMs
  • • Container orchestration (Kubernetes)
  • • Resource allocation strategies

Storage

  • • SAN/NAS solutions
  • • Object storage alternatives
  • • Backup and disaster recovery

Networking

  • • Load balancing
  • • CDN integration
  • • Security and firewalls

Management

  • • Monitoring and alerting
  • • Configuration management
  • • CI/CD pipeline adaptation

Team Requirements

Good news: You don't need to hire additional staff!

Our process is designed to work with your existing team. We provide:

Expert guidance throughout the migration
Hands-on support for complex tasks
Knowledge transfer and documentation
Post-migration training